New announcement. Learn more

TAGS

Auckland Transport Ferry Terminal, Kennedy Point, Waiheke Island, Auckland

Waiheke Island’s AT Ferry Terminal Building has undergone a facelift!

Cladding Systems NZ Ltd. used their sleek and stylish, solid aluminium cladding system, finished in MetWood Rimu to upgrade and update the AT Transport Hub, which provides ticket purchase, restroom and waiting room facilities for passengers travelling between Waiheke Island and Auckland city centre.

With the inherent properties of aluminium, the robustness of the Cladding Systems NZ Ltd. fixing system and the durability of the MetWood finish, the new-look terminal will cope beautifully with whatever the sea, sun and weather will throw at it for many years to come.

Why was a MetWood finish chosen?

“This project’s position requires the most durable finish available that can be applied to our pre-formed panels. Careful planning and coordination were required to obtain what we believe to be an excellent result. The MetWood finish is the first thing everyone sees and its use in close proximity to public foot traffic made compelling argument for its inclusion. The Warranty supplied covers 25 years against gloss retention and chalking in a marine environment.” (Cladding Systems NZ Ltd. 2020)